Finish Design Start Building

Final shape frame 

Now the design of frame and fuselage is ready! We are ordering all components. Batteries are placed in the motor spars on both sides.
The Astonishing Fuselage
The fuselage sections are now being prepared by Predrag. Next week they will be finished, and the work can begin. The fuselage is not a priority for the tests, but it is a parallel action.



Frame Connectors

The frame connectors designs were finished today; will start ordering the material on Monday and go making them.

Electric systems advice

This was also done, and resulted in a good suggestions to reduce cable length and connectors.

Working on belt drive system 

With Barry we are redesigning the Belt drive: more simple way to manufacture it compact and light.  This will continue over the course of these week.

By |March 7th, 2015|Uncategorized|0 Comments